Free tool
What does manual work cost you?
Put a number on the copy-pasting, chasing and re-keying your team does every week, and see how quickly automation could pay for itself.
Your result
€46,800 / year
That is about €3,900 per month spent on manual work.
Automating 70% would free up roughly €32,760 a year. Add an investment figure to see payback.
How this is calculated
Yearly cost = people × hours/week × 52 weeks × hourly cost
Monthly cost = yearly cost ÷ 12
Yearly saving = yearly cost × % removed
Payback (months) = investment ÷ (yearly saving ÷ 12)
3-year net = yearly saving × 3 − investment
Assumptions: 52 working weeks, constant team size and hours, the same saving every year, no running costs or maintenance. Treat the output as an estimate, not a forecast.
How to read the result
Making sense of the numbers
The calculator multiplies the people involved, the hours each of them spends on repetitive work per week and a fully loaded hourly cost across 52 weeks. The result is the yearly price of work that software could do instead. It is not a cost you see on an invoice, which is why it tends to be underestimated: it hides inside salaries and slow days.
Use a realistic hourly cost
Salary alone understates the figure. Add employer taxes, benefits, equipment and overhead. A common rule of thumb is 1.2 to 1.4 times gross pay. The default of €45 suits many small and mid-size teams in Europe, but use your own number.
Why the saving is never 100%
Automation removes the predictable, rule-based part of a task: moving data between systems, sending reminders, generating reports. Exceptions, approvals and quality checks usually remain. We default to 70% and let you change it with the slider. If you are unsure, try 50% for a cautious case and 80% for an optimistic one.
Payback and three-year net savings
If you enter a one-off investment, payback shows how many months of savings it takes to recover it. Three-year net savings is the saving over three years minus the investment. The model ignores ongoing costs such as hosting, licences and maintenance, and assumes volumes stay flat, so build a margin into your decision. A payback under twelve months is usually an easy yes; beyond twenty-four, look for a smaller first project.
What to do next
Pick the single process with the highest weekly hours and the clearest rules, and automate that first. Our guide on workflow automation with n8n walks through how. If you want a second pair of eyes on your figures, book a short call.





